Sunday, October 14, 2012

The Footings For The New Kennel Are Being Prepared


The company doing the building were very pleased with the site prep we had done. The company who hauled in the clay and packed it did a great job as you can see by the condition of the trenches. They were clean and hard with not even close to a cave off.
 
This shows the 'lines' (orange string) they had installed for the plumbers and electricians to work from. When this photo was taken the footings were in and already set and the drains and water lines and electrical had been installed and ready for the cap to be poured. The pour will be difficult because of the drains in the garage, the hall ways and the slopes in the kennel area.

No comments:

Post a Comment